lillen

On Arrival

This checklists is also available in a PDF version for offline use.

Activate the site facilities available:

  1. 240V Power
  2. Mains Water
  3. Greywater

Checklist

Please note! If using LPG gas, it can take up to 20 minutes before the fridge turns on.

The refrigerator must be level and will not operate if not parked on a flat surface.